Period |
CLIENT
WORK DESCRIPTION |
Oct-09 |
|
ANDES PETROLEUM COMPANY
Construction of 3700 m. of 10 Underground Pipeline, Tarapoa. |
Jan-09 |
|
CONSORCIO AZULEC-URAZUL-ORIENCO
Construction and Replacement of 456 Km of flow lines, from 2” O.D. to 26’ OD. |
Jan-09 |
|
PETROPRODUCCION
Design and installation of Scada, Control Rooms and Leak Detection System for Auca-Cononaco, Pipeline,
Includes operation and maintenance. |
Oct-08 |
|
PETROPRODUCCION
Replacement of 83 Km of underground 12” OD, 16” OD and 10” OD. Pipeline, South East Region. |
Jan-07 |
Jul-07 |
ANDES PETROLEUM COMPANY ECUADOR
Miscellaneous API Welding Services for Facilities, Tarapoa. |
Jan-06 |
Mar-07 |
PETROPRODUCCION
Environmental remediation services and Civil Works. Excavation, transport and treatment of oil residues.
Sacha, VHR, Cuyabeno, Lago Agrio, Guanta. |
Jan-06 |
Dec-06 |
PETROPRODUCCION
Environmental remediation services and Civil Works. Excavation, transport and treatment of oil residues.
Sacha, VHR, Cuyabeno, Lago Agrio, Guanta. |
Jan-06 |
Jan-06 |
PETROPRODUCCION
Construction of 6” OD pipeline South Sacha, 4000 meters. |
Jan-06 |
Jun-06 |
OILGEAR TOWLER / CEDAL
Mechanical works for expansion of aluminum extrusion plant. |
Jun-05 |
Dec-05 |
PETROPRODUCCION
Environmental remediation services and Civil Works. Excavation, transport and treatment of oil residues. VHR Block. |
Jan-05 |
Jun-05 |
PERENCO OIL ECUADOR
Construction of access road and 40m bridge to Condor Norte Exploration Pad. 6.000 meters. |
Jan-05 |
Dec-05 |
Chanquing Petroleum Exploration Bureau
Construction of Atacapi 23 Pipeline 4 1/2"O:D. 4500m. |
Nov-04 |
Jan-05 |
PERENCO ECUADOR
Mechanical assembly of CPF Production Facility. |
Sep-04 |
Jan-05 |
Chanquing Petroleum Exploration Bureau
Construction of Atacapi 15, 16 and 17 Pipelines 11,000m combined of 4 5/8" O.D SCH 40. |
Jul-04 |
Aug-04 |
PERENCO ECUADOR
Construction of underground high pressure reinjection pipeline NEMOCA, Yuralpa. 8,000 m 8"O.D. 0.5 W.T. |
Mar-04 |
Apr-04 |
Chanquing Petroleum Exploration Bureau
Construction of Atacapi 14 pipeline. 3,000 m. 4,5" O.D. |
May-04 |
Jul-04 |
PERENCO ECUADOR
Construction of OSO 1 Oso 2- Oso 4 Pipeline 11.000 m 6.5" O.D. |
Mar-04 |
Apr-04 |
Chanquing Petroleum Exploration Bureau
Construction of Atacapi 13 pipeline. 5,000 m. 4 5/8" O.D. |
Mar-04 |
Apr-04 |
AEC. ECUADOR
Construction of cellars and civil works. Tarapoa. |
Jan-04 |
Dec-04 |
Chanquing Petroleum Exploration Bureau
Construction of Atacapi 12 pipeline. 3.000 meters 4" diameter. |
Sep-03 |
Jan-04 |
ABB/COINTEC
Construction and erection of electric transmission line Dureno-Secoya, 135 Kva, 40 km. |
May-03 |
Aug-03 |
ABB/COINTEC
Construction and erection of electric transmission line VHR, 135 Kva, 20 km. |
Apr-03 |
May-03 |
Chanquing Petroleum Exploration Bureau
Construction of Atacapi 11 pipeline. |
Mar-03 |
Apr-03 |
A.E.C. Ecuador
Constuccion and erection of 135 kva electric transmission line. Tarapoa. |
Jan-03 |
Dec-03 |
A.E.C. Ecuador
Contract for provision of gravel, sand and materials. Pindo. |
Jan-03 |
Dec-03 |
A.E.C. Ecuador
Provision of welding services and equipment and miscellaneous services. |
Sep-02 |
Dec-02 |
CONDUTO ECUADOR
Cut and Lift 24" 4000 m. Pipeline, Eden Yuturi. |
Nov-02 |
Dec-02 |
VINTAGE OIL ECUADOR
Construction of Hormiguero 4 Pipeline 3,000 meteres 4" O.D. Pindo. |
Jun-02 |
Aug-02 |
ALBERTA ENERGY COMPANY
Construction and Erection of 135kva electric transmission line Dorine 1- Dorine 5. |
Jun-02 |
Aug-02 |
ALBERTA ENERGY COMPANY
Construction and Erection of 135kva electric transmission line Dorine 1- Dorine 5 |
Apr-02 |
May-02 |
CHINA PETROLEUM
Construction of 3,000m 4" O.D. Pipe Line Line Atacapi 10. |
Dec-01 |
Jan-02 |
KERR McGEE
Contruction of 2000 meter 4" O.D. Pipeline OSO. |
Apr-01 |
Sep-01 |
PETROBELL
Maintenance and Road Reconstruction Provision of qualified personnel and equipment. TIGUINO. |
Jan-01 |
Sep-02 |
ALBERTA ENERGY COMPANY ECUADOR
Provision of qualified personnel and equipment for miscellaneous services for the construction of platforms and civil
works. |
Oct-00 |
Oct-00 |
PETROCOL
Cleaning and Hydro test of Pipe (Diam: 4") TIGUINO CPF. |
Sep-00 |
Sep-02 |
CITY INVESTING CO. LTD.
Contrato de Mantenimiento Vial, Facilidades y Pista de Aterrizaje en el Bloque Tarapoa, Bloque 27 y sus
alrededores. |
Aug-00 |
Oct-00 |
PETROINDUSTRIAL
Construction of 18Km of 6 5/8" diameter gas pipeline from "Est. Aguarico" to "Estación Norte" and from
"Estación Norte" to "Planta Gas del CIS". |
Dec-99 |
Jul-00 |
CITY ORIENTE LTD.
Provision of 120 ton and 300 ton capacity BARGES for fluvial transport and logistics. |
Jan-99 |
Apr-00 |
CITY ORIENTE LTD.
Construction of 2.5km access road. Construction of two platforms. Provision and transport of 90.000 m3 of gravel
and sand. |
Nov-99 |
Jan-00 |
CITY INVESTING COMPANY
Welding works, installation of supports and defenses for Tarapoa- Lago Agrio pipeline. |
Nov-98 |
Sep-02 |
CITY INVESTING COMPANY
Miscellaneous Services: provision of heavy equipment for the construction of Petroleum installations and specialized
welding services. |
Apr-98 |
Aug-99 |
INA BROMCO
Provision of 25 ton Sidebooms, heavy equipment and personnel for the construction of 80 Km 36" dia. Water pipeline. |
Apr-99 |
Aug-99 |
CITY INVESTING COMPANY
Installation and construction of piles and cement bases for electric transmission line. Tarapoa. |
Feb-99 |
Apr-99 |
CONDUTO
Provision of equipment and personnel for the construction of Baeza-Cosanga pipeline by-pass for Arco Oriente. |
Jan-99 |
Jan-99 |
CONDUTO
Installation of 1.600 ft of 12" & 16" pipeline, for City Investing Co. Tarapoa. |
Sep-96 |
Oct-98 |
PETROPRODUCCION
Provision of Heavy equipment for the maintenance repair and construction of oil installations. |
Apr-96 |
May-96 |
INECEL
Construction of 6 5/8" pipeline from Poliducto Quito-Ambato to Santa Rosa Station. |
Aug-96 |
Sep-96 |
ELF HIDROCARBURE EQUATEUR
Installation of 18.000 ft. pipeline. Auca Sector, North East Region. |
Nov-93 |
Jan-96 |
CITY INVESTING CO.
Provision of equipment and personnel for the maintenance of road, pipeline, transfer lines and airport. |
Mar-94 |
Jan-96 |
PETROPRODUCCION
Construction of various pipelines totaling 895.000 ft. of high preassure flow lines. North East Region. |
Sep-93 |
Jun-94 |
ELF HIDROCARBURE EQUATEUR
Maintenance of 30Km. road and access roads, welding services. South Auca Region. |
Jul-92 |
Jun-93 |
CONSEJO PROVINCIAL DE SUCUMBIOS
Construction of road Union - El Progreso. |
Nov-91 |
Oct-93 |
CITY INVESTION CO.
Provision of equipment and personnel for the maintenance of road, pipe line, transfer lines and airport. |
Apr-91 |
Mar-93 |
PETROPRODUCCION
Installation of 393.000 ft. of crude oil pipe line in North East Region. |
Feb-91 |
Nov-91 |
INECEL
Construction of electric tower platforms of 65 Kv. and subtransmission lines. |
Jan-90 |
Feb-90 |
COLL CONSTRUCCIONES
Installation of 72.000 ft. of high preassure gas line form Secoya to Shushufindi stations. |
Nov-89 |
Oct-91 |
CITY INVESTING
Construction and maintenance of roads, airfield, pipeline and other oilfield facilites. |
Mar-89 |
Feb-91 |
PETROECUADOR
Construction of 295.000 ft. of pipe line in North East oil field facilities. |
May-88 |
Oct-88 |
CEPE
Instalation of 31.160 ft, of pipe line in North East oilfields. |
Feb-86 |
Oct-88 |
TEXACO
Provision of heavy equipment and personnel for maintenance of roads in Shushufindi. |
Nov-87 |
Dec-89 |
CEPE
Construction of access road to Shushufindi refinery. |
Nov-87 |
Nov-89 |
CEPCO
Provision of heavy equipment and personnel for maintenance of roads, pipelines, and other oilfield facilities. |
Apr-87 |
May-87 |
PROTEXA
Construction of 11 miles. 10" emergency crude oil pipeline from Lago Agrio to San Miguel River. |
Jul-86 |
Mar-87 |
PALMAORIENTE
Transport and placement of gravel in Huachito-Coca Plantations. |
Jul-85 |
Jul-87 |
CEPE
Construction of 246.000 ft. of 4 1/2" diameter pipeline, Pastaza Province. |
Apr-85 |
Jul-85 |
CEPE
Instalation of 37.000 ft. 4 1/2" diameter flow line in Cuyabeno sector. |
Feb-85 |
Apr-87 |
CEPCO
Maintenace of roads, flow lines and airport at Tarapoa. |
Jul-84 |
Sep-84 |
CEPE
Construction of 16.000 ft. 4 1/2" diameter flow line in Tetete and Sansahuari. |
Feb-84 |
Nov-84 |
CEPE
Construction of 15.250 ft. Of 4 1/2" diameter flow line in Shushuqui oil well. Construction of 150.000 ft. 4 1/2" diameter
flow line in Bermejo. |
Jun-83 |
Jan-00 |
CEPE
Construction of various crude oil flow lines totalling 104.000 ft. Of various diameters, in Secoya, Shuara, Shushuqui
and
Libertador areas. |
Apr-83 |
Oct-83 |
CEPE
Construction various crude oil flow lines totalling 203.000 ft. Of various diameters, in Tete, Sansahuari and Cuyabeno
areas. |
May-82 |
Apr-84 |
CEPCO
Provision of equipment and personnel, and maintenance of roads, crude oil flow lines, pumping stations and secondary
oil transfer lines, Tarapoa-Lago Agrio. |
Mar-82 |
Oct-82 |
CEPCO
Provision of Mack DM-800 40 Ton oilfield winch at Tarapoa for various services. |
Mar-82 |
Jul-82 |
CEPE
Construction of flow lines and transfer lines for crude oil. Totaling 185.000 ft. In Charapa, Secoya, Shuara and
Shushuqui
oil fields. |
Nov-81 |
Dec-81 |
CONSORCIO IDCO-ANEC-INECEL
Engineering and construction of Salado River dam. |
Mar-81 |
Mar-82 |
CEPE
Engineering, provision of material and construction of compressor stations and gas gathering stations located
at Aguarico
Central Station and Shushufindi. |
Mar-80 |
Feb-82 |
CEPCO
Maintenance or road network, flow lines, pumping stations and secondary transfer lines between Tarapoa and Lago Agrio. |
Mar-80 |
Jun-81 |
CEPE
Construction of 20 Km. access roads and 4 drilling platforms in Bermejo, Amazon Region. |
Jan-80 |
Sep-80 |
ECUANAVE
Provision of welding works and engineering for the repair of tanker ships in Guayaquil. |
May-79 |
Nov-80 |
SAETRAME
Engineering and Construction of gas lines and connections, fire fighting system, operating facilities and other civil work
for LPG Plant in Shushufindi. |
Feb-78 |
Feb-80 |
SAETRAME
Construction of foundations, hard stands, administrative and living facilities, and other civil works for the LPG plant at
Shushufindi. |
Mar-80 |
Feb-82 |
TEXACO
Maintenance and reparation work on the Tarapoa-Lago Agrio road and crude oil pipeline. |
Jun-77 |
Feb-78 |
CEPCO
Provision of heavy equipment for various works. |
Jul-77 |
Dec-77 |
TEXACO
Welding and maintenance services in Lago Agrio, Sacha, Shushufindi and Auca. |
May-77 |
Jul-77 |
ECUADORIAN CORPS OF ENGINEERS
Provision of heavy equipment in Lago Agrio. |
Apr-77 |
May-77 |
TEXACO
Heavy equipment transport services, through Lago Agrio, Shushufindi and Sacha areas. |
Feb-77 |
May-77 |
TEXACO
Instalation of 4" and 6" diameter flow lines in Lago Agrio, Sacha, Shushufindi and Auca. |
Jun-77 |
Oct-77 |
CEPCO
Installation of 4" and 6" diameter flow lines at Tarapoa. |
Jun-77 |
Sep-77 |
SUPERSER
Construction of camp site and camp installations for company. |
Feb-77 |
Apr-77 |
M.O.P.
Construction of 25 miles of access road Cosanga-Caucheras. |
Aug-76 |
Sep-76 |
M.O.P.
Construction of 15 miles of access road Aguarico-Coca-Los Respaldos. |
Aug-76 |
Dec-76 |
CEPE
Preparation of site for construction of LPG Plant in Shushufindi. |
Mar-76 |
Dec-76 |
CEPE
Construction of remote drilling sites and facilities for exploration oil wells, including welding services in support of
drilling operations. |
Apr-76 |
Apr-77 |
INECEL
Road maintenance and civil works at Mirador and San Rafael, Coca Project. |
Jul-75 |
Jun-77 |
TEXACO
Miscellaneous welding works at Lago Agrio, Sacha, Shushufindi, Aguarico and Auca. |
Jan-75 |
Dec-75 |
INECEL
Construction of 2nd. stage of road, from Coca to Reventador. |
Feb-74 |
Jan-76 |
TEXACO
Maintenance of the roads along the Trans-Ecuadorian pipeline from Lago Agrio to the Balao Oil terminal in Esmeraldas. |
Jan-75 |
Oct-75 |
TEXACO
Provision of personnel, vehicles and tools for miscellaneous work in Lago Agrio, Coca, Shushufindi and Auca. |
Jan-74 |
Oct-74 |
INECEL
Maintenance of roads and civil works in Mirador and San Rafael del Coca. |
Sep-74 |
Dec-74 |
INECEL
Construction of first stage access road from Coca to Reventador Mountain. |
Jan-74 |
Dec-74 |
CAYMAN DEL ECUADOR
Construction of 19 miles of access roads From Chiritza, Aguarico River, to Cayman base camp at Tarapoa. |
Sep-73 |
Oct-73 |
Construction of reinforced concrete foundations and welding work for three 10.000 BB tanks in Lago Agrio and Balao. |
May-73 |
Oct-73 |
TEXACO
Maintenance of roads along Trans-Ecuadorian Pipe line terminal in Balao. |
Jan-73 |
Jun-75 |
TEXACO
Miscellaneous welding services in Lago Agrio, Sacha, Shushufindi, Coca and Auca. |
Sep-72 |
Nov-74 |
TEXACO
Construction of flow lines in Lago Agrio, Sacha, Shushufindi and Auca. Total 507.000 ft of various diameters. |
Jun-72 |
Jun-73 |
TEXACO
Maintenance and repair services of vehicle and truck fleet at Lago Agrio. |
Jan-72 |
Feb-73 |
TEXACO
Specialized welding services in Coca, Lago Agrio, Sacha, Shushufindi and Aguarico. |
Feb-72 |
Jan-73 |
TEXACO
Transportation of pipe line and heavy equipment in the following areas: Lago Agrio, Shushufindi, Aguarico and Auca. |
Jul-71 |
Oct-71 |
TEXACO
Engineering and Topography for the construction of the road Coca-Auca, Amazon Region of Ecuador. |
Jan-72 |
Sep-72 |
TEXACO
Construction of permanent quarters and administrative facilities along the pumping stations of the Trans-Ecuadorian
Pipeline at Papallacta, Baeza, Salado and Esmeraldas. |
May-71 |
May-72 |
AMOCO PETROLEUM CORP
Construction and operation of Hercules C-130 category airfield, permanent camp, lighting, and other facilities for
oil exploration at Montalvo, on the Bobonaza River, Amazon Region. |